Engineering concept sketch with handwritten annotations and redline markups on technical drawing paper
REV A — CONCEPT SKETCH

D-0 // Requirements Document

A napkin sketch. A napkin sketch with tolerances. Your program's next gate review is in 3 weeks.

Finished machined titanium prototype photographed on granite surface plate with calipers resting beside it
APPROVED — FLIGHT HARDWARE

D+14 // Flight-Ready Prototype

Machined titanium. Dimensional report attached. Ready for your gate review.

14d
Concept-to-Metal
±0.0005″
Tolerance
100%
ITAR Compliant

From requirements document
to your hands.

Faster than your procurement cycle. Forge runs 6-axis CNC mills through the night cutting titanium while engineers iterate CAD models in the next room. SBIR Phase II, DOD demonstrators, dual-use autonomy hardware — we close the gap between concept and flight-ready metal.

Capability Matrix

Six core competencies. Every card leads with the number a program manager needs before they read the paragraph.

Hover card to reveal case study →
6-Axis CNC
18
hrs to first cut

Titanium. Inconel. 7075 Alloy.

±0.0005″ tolerance
Ti-6Al-4V certified
Lights-out operation
Case Study
CNC milling machine cutting titanium aerospace component with precision tooling
SBIR Phase II

UAV Structural Frame

Titanium airframe bracket for small UAS — 14 unique parts, full dimensional report, delivered to prime contractor in 11 days from approved drawing.

11days, drawing to delivery
Additive Metals
170
ksi tensile (Ti-6Al-4V)

DMLS / SLM In-House.

316L, 17-4PH, Inconel 625
CT scan verification
HIP processing available
Case Study
Metal additive manufacturing DMLS machine printing aerospace grade titanium component
DOD Demonstrator

Thermal Management Housing

Complex internal lattice cooling channels impossible to machine — printed in Inconel 625, HIP processed, pressure tested to 3× operating load.

72hrs print-to-test-ready
Environmental Testing
22
MIL-STD methods qualified

MIL-STD-810H In-House.

Vibe: 5–2000 Hz, 50 grms
Thermal: -65°C to +200°C
Shock: 100g half-sine
Case Study
Environmental test chamber with aerospace hardware undergoing vibration and thermal testing
Gate Review Support

EO/IR Gimbal Assembly

Full MIL-STD-810H Methods 514.8, 516.8, and 501.7 on a gimbaled EO/IR payload — test report delivered same day as completion, gate review cleared.

4days full test campaign
Reverse Engineering
0.001
″ scan resolution

Scan-to-CAD in 48 hrs.

Romer arm + blue-light scan
GD&T full report
CATIA / SolidWorks / STEP
Case Study
CMM coordinate measuring machine scanning aerospace component for reverse engineering
Legacy Re-Manufacture

Obsolete Actuator Housing

No drawing, no digital model — 1970s-era actuator housing for a legacy system. Scanned, modeled, tolerance-verified, and reproduced in aluminum in 6 days.

6days scan to machined part
Electronics Integration
48
hrs PCB to functional

Embedded Systems. Flight Computers.

PCB layout & fabrication
FPGA / ARM integration
EMI shielding & coatings
Case Study
Custom PCB circuit board with embedded processors for aerospace avionics integration
Autonomy Hardware

Dual-Use Nav Computer

Custom flight computer for a dual-use autonomous platform — sensor fusion board, ruggedized enclosure, and full functional test in under 3 weeks from schematic.

19days schematic to flight test
System Integration
3
wk concept to HIL

Hardware-in-the-Loop Ready.

Multi-domain integration
HWIL test facility
RF / EO / INS subsystems
Case Study
Aerospace system integration lab with hardware-in-the-loop testing equipment and flight computers
SBIR Phase I Feasibility

Hypersonic Seeker Demo

Full seeker demonstrator — optics, gimbals, electronics, and enclosure — integrated and HIL-tested against government-provided simulation environment in 21 days.

21days to HIL demonstration

Past Performance

Classification-safe summaries. Every entry is a number, then a proof — the evidence wall a program manager needs before they can justify sole-source.

47+
Programs Delivered
100%
On-Time Rate
0
ITAR Violations
14days
Unclassified2025

SBIR Phase II — Air Vehicle Structures

Mid-tier defense prime, Southwest division

Deliverable

Titanium airframe subassembly, 23 unique parts, full AS9100D documentation package

Outcome

Delivered 4 days ahead of SBIR milestone gate. Prime used prototype for Phase III proposal imagery.

11days
CUI2025

DOD Acquisition Demonstrator — Unmanned Ground Vehicle

Program Executive Office, Ground Combat Systems

Deliverable

Aluminum structural chassis with embedded sensor mounts, environmental sealed to IP67

Outcome

Demonstrator operated at Aberdeen Proving Ground during acquisition gate review. Contract awarded.

19days
Unclassified2024

Dual-Use Autonomy — Navigation Hardware

Series-B funded autonomy startup, commercial + defense dual-use

Deliverable

Custom navigation computer enclosure, PCB integration, full thermal analysis, vibration tested to MIL-STD-810H

Outcome

Hardware shipped to customer within 19 days of signed NDA. Startup used prototype to close $12M defense contract.

6days
Unclassified2024

Legacy System Sustainment — Obsolete Actuator

Depot-level maintenance organization, CONUS

Deliverable

Reverse engineered actuator housing, no drawing available, reproduced to original spec from scan data

Outcome

Part matched OEM dimensions within 0.0004″. 40-unit production run followed within 30 days.

Full past performance package available upon request with .mil or .gov email verification

Facility & Credentials

The compliance stack a program manager needs to justify sole-source. Every certification earned, not claimed.

Forge machine shop floor with CNC mills running and engineers at CAD workstations under fluorescent lighting
12,000
sq ft facility
Secure machining floor
24/7
Operations
Lights-out CNC capability
38
Engineers on staff
ME, EE, Systems
ITAR
Registered
AS9100D
Certified
ISO 9001:2015
Certified
CAGE 8XF42
Active

Key Equipment

Partial Listing
CNC
Mazak Integrex i-400
6-Axis Turn-Mill, 1200mm swing
CNC
Haas UMC-750SS
5-Axis VMC, 30″×20″×20″ envelope
Additive
EOS M 290
DMLS Metal 3D Print, 250×250×325mm
Metrology
Romer Arm + Creaform
0.001″ resolution, portable CMM
Test
Unison LFV Shaker
50,000 lbf, 5–2000 Hz
Test
Thermotron S-16
-65°C to +200°C thermal chamber
MIL-STD-810H
22 Methods Qualified
NIST SP 800-171
Compliant

ITAR Notice

This facility and its technical data are subject to U.S. export control laws. All visitors require advance approval.

Engage Forge

Two paths. One question: what does your program need this week?

Primary Conversion Path

A Forge program manager reviews every brief request personally. Response within 4 business hours.

Do not include classified information. Use SIPR or secure channel for classified requirements.

+1 (703) 555-0194
programs@forgedefense.com
Huntsville, AL 35806 · CONUS